£0.00
Running pipe work from an externally mounted air source heat pump or biomass boiler into a property requires the pipe work to be run through the exterior wall. The hot pipe work will be affected by cold bridging and heat loss if it is not insulated correctly. MIS 3005 requires external pipework and pipework running through external walls to be adequately insulated.
The Pump House TW-KIT (Through wall insulation kit) provides both thermal insulation within the wall and comes complete with an elbow section to cover the external copper pipe connection.
Whilst every effort has been made to ensure the prices within this website are correct, prices charged will be those ruling at date of despatch. All prices quoted are inclusive of VAT.
Errors & Omissions: Although care has been taken to ensure all information and images on this website are accurate, William Wilson takes no responsibility for errors, omissions and product technical changes within the content of this website.
Copyright © William Wilson 2024. All rights reserved.
William Wilson Ltd, Registered number: SCO 14691. Registered office: Hareness Road, Altens Industrial Estate, Aberdeen. AB12 3QA